Automotive Harness Assembly

Vehicle harnesses built to drawing — body, lighting, sensor and auxiliary circuits, with the inspection scope and change record agreed before the first build.

Drawing + BOM

Build basis

Crimp pull test

Joint control

Batch traceability

Records

Automotive terminals and connector housings prepared for harness assembly
Terminal and connector reference sample. Assemblies are built to the approved drawing.
01 Build options

Explore automotive harness areas.

Vehicle harnesses divide by system. Choose the area to see how the construction changes.

Automotive work is documentation-heavy by design. The drawing revision, the connector schedule and the test specification are part of the deliverable, not background paperwork.

The high-count part of the harness, defined by the vehicle layout and the connector system.

01

Body and door looms

Assemblies crossing hinges, with the flex and abrasion protection the routing requires.

02

Interior and switch wiring

Leads to switches, indicators and interior lighting, with the connector series the modules use.

03

Seat and trim wiring

Compact looms for seat sensors, heating and adjustment motors.

Vehicle-level validation, homologation and functional safety stay with the vehicle programme. Harnk builds and inspects to the supplied specification.

02 Specification

What an automotive harness quotation needs

The drawing set and the test scope decide everything else.

01

Drawing set

Harness drawing with branch geometry and the connector and terminal schedule.

02

Test specification

Continuity, hipot, pull-off, dimensional and functional tests required by the programme.

03

Approved materials

Wire types, insulation classes, sealed or unsealed connectors and splice methods.

04

Environment

Temperature class, fluid exposure, vibration profile and the IP rating of each interface.

05

Documentation

Whether inspection records, first-article reports or change logs must ship with each batch.

06

Volume and change control

Prototype, pre-series and series quantities, plus the engineering change process.

If the drawing is still moving, a prototype build from the current revision is the fastest way to expose the open points. Read the automotive harness guide

03 Application

Different circuits. Different checks.

A lamp circuit and a camera link are not verified the same way. Match the inspection to the circuit function.

01

Body and lighting circuits

Check connector seating and lock confirmation, terminal pull-off, sealed-splice integrity and branch geometry.

02

Sensor and signal circuits

Verify continuity, pin-to-pin mapping, shield termination and separation from power conductors.

03

Exposed and under-hood runs

Confirm temperature class, fluid resistance and that every connector cavity is sealed or plugged.

04

Documentation

Confirm which records ship with each batch and how engineering changes are released and tracked.

04 Manufacturing

How the build is controlled

The same process controls run on every build, whether it is a prototype run or a repeat order.

01

IQC incoming control

Dedicated IQC staff inspect incoming materials and retain inspection records.

02

In-process inspection

First-article confirmation, patrol inspection, and SPC process monitoring.

03

MES traceability

MES covers the entire process flow, so any anomaly is located and handled fast.

04

8D closed-loop response

Agreed response times and internal escalation paths — clear ownership, fast resolution.

Locked process parameters
Crimping, soldering, molding and waterproofing run on locked parameters with defined acceptance criteria.
Outgoing control
OQC inspection and mix-prevention packaging standards control outbound quality.
Compliance documents
Certifications and test reports available on demand for compliance audits.
Factory visits
Book a tour and walk the production floor along our visitor route.
06 FAQ

Questions that come up before ordering

01 What documentation has to come with an automotive harness enquiry? Specification

The drawing or the wire list, the connector schedule, the terminal part numbers and the sleeve callouts. With those four the build can be quoted and tooled; without them the specification is guesswork.

02 How is crimp quality controlled? Process

The crimp height and pull-test value are set per terminal and wire combination before the run, then checked at a defined frequency during it. Both records are kept against the batch.

03 Can batches be traced back to the wire and terminal lots? Traceability

Yes. Material lots, the tooling used and the inspection results are recorded against the batch, so a question about one delivery can be answered without re-inspecting the stock.

04 What is supplied with each batch? Documentation

Crimp records, continuity results and the material lot list are retained for the run, and can be issued with the shipment on request.

Planning Automotive Harness Assembly?

Send the drawing, the connector schedule or a photo of the existing assembly. We review what you have and come back with the open points and a quotation path.