Built to specification · Cable Assemblies

Custom USB Cable Assemblies

USB links built into equipment rather than sold as accessories — where retention, bend life and panel mounting matter more than the retail finish.

2.0 / 3.0

Data class

A – C

Connector ends

Shielded

Pair construction

Cable assemblies with connectors prepared for equipment wiring
Assembly reference sample. Connector style and overmoulding follow the equipment design.
01 Build options

Choose the USB configuration.

Version decides the data rate and the conductor count. Connector style decides what the equipment can be plugged into.

A USB cable that works on a desk and one that survives a machine enclosure are different products. The specification should start from how the cable is handled.

The data rate requirement fixes the construction before anything else is decided.

01

USB 2.0

One differential pair plus power — sufficient for serial-style devices, keyboards and service ports.

02

USB 3.x

Additional SuperSpeed pairs with tighter impedance and shielding requirements.

03

Power-only

Charging and supply leads where no data pair is needed.

USB 3.x requires additional differential pairs and stricter impedance control than USB 2.0. The two are not interchangeable at SuperSpeed rates.

02 Specification

What a USB cable quotation needs

USB projects are usually quick once the version and both connectors are fixed.

01

USB version

2.0, 3.x or power-only, which sets the conductor count and impedance target.

02

Connectors

Part number or type at each end, plus gender and orientation.

03

Length

Nominal length, and whether the run is fixed or handled repeatedly.

04

Mechanical build

Overmoulding, panel mount, locking or standard moulded hoods.

05

Shielding

Whether full shielding and a drain wire are required for the environment.

06

Marking

Labelling, colour and any branding on the overmould.

For equipment ports, a panel-mount connector usually outlasts a cable that is plugged and unplugged at the device. See the connectors overview

03 Manufacturing

How the build is controlled

The same process controls run on every build, whether it is a prototype run or a repeat order.

01

IQC incoming control

Dedicated IQC staff inspect incoming materials and retain inspection records.

02

In-process inspection

First-article confirmation, patrol inspection, and SPC process monitoring.

03

MES traceability

MES covers the entire process flow, so any anomaly is located and handled fast.

04

8D closed-loop response

Agreed response times and internal escalation paths — clear ownership, fast resolution.

Locked process parameters
Crimping, soldering, molding and waterproofing run on locked parameters with defined acceptance criteria.
Outgoing control
OQC inspection and mix-prevention packaging standards control outbound quality.
Compliance documents
Certifications and test reports available on demand for compliance audits.
Factory visits
Book a tour and walk the production floor along our visitor route.
05 FAQ

Questions that come up before ordering

01 How is the data rate protected in a custom length? Signal

By holding the pair construction and impedance the standard specifies. Stretching a 3.0 lead beyond its rated length, or changing the conductor gauge, is what degrades the link — not the connector.

02 Can the lead be built with a right-angle or panel end? Mechanical

Yes. Overmoulded straight, right-angle and panel-mount versions are all built to the same drawing, with the shell orientation fixed at moulding.

03 Is a custom USB lead still compliant? Compliance

The lead follows the construction the standard defines for the connector and pair type. Whether the finished product passes compliance testing depends on the whole device, and is tested as a system.

04 What is supplied with each batch? Documentation

Connector types, length and pair construction are recorded for the run, and the inspection record can be issued with the shipment on request.

Need USB Cables to a specific length?

Send the connector part numbers, the length and the installation conditions. We confirm the open points and quote against the approved specification.