Built to specification · Cable Assemblies

DC Power Cable Assemblies

Low-voltage power leads for equipment, adapters and distribution — where the connector has to match the device, and the conductor has to match the load.

5.5 / 2.1 mm

Barrel size

Centre + / −

Polarity

Moulded or field

Termination

Terminals and power connector components prepared for a DC cable assembly
Connector reference sample. Plug dimensions and polarity follow the device specification.
01 Build options

Choose the DC configuration.

The device connector decides the plug; the load decides the conductor; the environment decides the jacket.

DC connectors are far less standardised than they look. Barrel jack dimensions, polarity and locking style vary, and the wrong plug either does not fit or does not stay in.

The plug has to match the device socket exactly — diameter, length and polarity.

01

Barrel jacks

Common dimensions such as 5.5 × 2.1 mm and 5.5 × 2.5 mm, centre-positive or centre-negative.

02

Locking connectors

Screw-locked or bayonet DC connectors for equipment that must not be unplugged accidentally.

03

Terminal and lug ends

Ring terminals, ferrules or lugs for distribution and panel connections.

Polarity is not universal on barrel connectors. Confirm centre-positive or centre-negative against the device marking before building.

02 Specification

What a DC cable quotation needs

The connector dimensions and the current are the two values that cannot be guessed.

01

Connector dimensions

Plug outer and inner diameter, length, and polarity.

02

Operating current

Continuous current, which sets the conductor cross-section.

03

Voltage

Nominal voltage and the acceptable drop over the run length.

04

Length

Nominal length — long runs at low voltage lose a meaningful share of the supply.

05

Jacket

PVC or a more abrasion-resistant material for the installation.

06

Locking

Whether the connector must lock, and any strain relief at the device end.

If the current and the length are both known, check the voltage drop before fixing the conductor size. Run the voltage drop calculator

03 Manufacturing

How the build is controlled

The same process controls run on every build, whether it is a prototype run or a repeat order.

01

IQC incoming control

Dedicated IQC staff inspect incoming materials and retain inspection records.

02

In-process inspection

First-article confirmation, patrol inspection, and SPC process monitoring.

03

MES traceability

MES covers the entire process flow, so any anomaly is located and handled fast.

04

8D closed-loop response

Agreed response times and internal escalation paths — clear ownership, fast resolution.

Locked process parameters
Crimping, soldering, molding and waterproofing run on locked parameters with defined acceptance criteria.
Outgoing control
OQC inspection and mix-prevention packaging standards control outbound quality.
Compliance documents
Certifications and test reports available on demand for compliance audits.
Factory visits
Book a tour and walk the production floor along our visitor route.
05 FAQ

Questions that come up before ordering

01 How is polarity confirmed? Polarity

By the marking on the device and the plug barrel dimensions together. The centre conductor and the outer sleeve are wired to the polarity the device states, and the lead is marked accordingly.

02 Which barrel size is standard? Specification

5.5 mm outside with a 2.1 mm or 2.5 mm centre is the common pairing. The device socket decides, and the two dimensions are specified together because either alone is ambiguous.

03 Can the lead be built with a strain relief boot? Mechanical

Yes. Moulded boots and field-assembly versions are both built, and the boot length is chosen for the bend radius the installation allows.

04 What is supplied with each batch? Documentation

Barrel size, polarity and length are recorded for the run, and the inspection record can be issued with the shipment on request.

Need DC Cables to a specific length?